LMK Internal Driver Retrofit Kit:

Step-by-Step Installation Guide

Whether you are an ESCO designing a multi-facility infrastructure rollout or a contractor balancing a tight installation timeline, LED Stick is your technical partner. We don’t just provide hardware; we provide the submittals, rebate verification, and "No-Hassle" support you need to keep your projects profitable and on schedule.

Have a specific technical question or need a bulk project quote? Our team is standing by to help you maximize your ROI and minimize your field hours.

Request Quote

Expert Support for Your Next Lighting Project

LMK Internal Driver Retrofit Kit

At LED Stick, we understand the pressure you face in the field. Tight schedules, large rollout projects, and the need for consistent installs across multiple crews leave no room for uncertainty. We built our installation system to support real-world job conditions. Whether you manage a single site or a multi-location rollout, our guides help your team:

  • Reduce install time per fixture

  • Maintain consistent quality across crews

  • Minimize call-backs and rework

  • Scale projects with confidence

We at LED Stick work with LMEnergysolution products to give you a process that performs in the field.

LMK Internal Driver Retrofit Kit

Step-by-Step Installation Guide

  1. Power Down & Disconnect: Remove the belly pan cover. Connect the LMK power whip directly to the incoming power source.

  2. Mount Clips: Replace the belly pan cover. Use self-tapping screws to secure two LMK clips per 4’ fixture.

  3. Lens Verification: Note: The included magnet clips are intended only for installations protected behind a lens or cover.

  4. Snap-In Fixture: Plug in the power whip and snap LMK #1 firmly into the pre-mounted clips.

  5. Linking (6" Jumper): Connect the 6” jumper cable to the end of LMK #1.

  6. Daisy-Chain Assembly: Link the 6” jumper to LMK #2 and snap the second fixture into its clips.

  7. Maximum Capacity: Continue end-to-end connections as needed.

    1. Pro-Tip: A single power whip supports up to 4.5 units (26 - LMK418 on 120v / 69 - LMK418 on 277v).

Safety & Compliance Tip

Before closing the fixture, ensure all jumper cables are seated securely and not pinched by the belly pan. A secure 'snap' during installation ensures the vibration-resistant fit required for industrial environments.

Install Faster with a Proven System

You do not need to slow down your project to figure out installation. Our LED Stick Installation Guides give you a clear path from start to finish.

See the 30% Faster Install in Action

Watch our LMK 8' Strip Fixture Retrofit Installation walkthrough video to see how our direct-wire design eliminates the need for ballast bypass complexity and reduces field time.

Need a Technical Submittal?

Don't slow down your project for paperwork. Click below to request a full technical submittal package or to speak with a master electrician about your installation specs.